Building Size:   2 separate, identically designed
Class A Office buildings.
Total 190,014 +/- SF

Year Built:   1989, by the Turner
Construction Company

Architect:   The Hiller Group

Site:   13.944 Acres

Column
Width:

  30’ x 30’

Floor Load:

  80 lbs psf live load

Roof:   Mechanically Fastened Sarnafil "EnergySmart" White Thermoplastic Roof Membrane System

Ceiling
Heights:
  Slab to slab is 12’8” at the garage level, 13’8” on the 1st & 2nd floors & 14’0” on the 3rd floor. Finished ceilings at 9’0”.

Lobby
Finishes:
  Paneled in a mahogany system with
granite floor & polished brass accents.

Curtain
Wall:
  Buildings: Hand laid Endicott brick
Atriums: Reflective grey solar glass

Structural System:   Composite structural system with SYSTEM: structural steel columns, wideflanged steel framing and bolted steel connections with poured-inplace reinforced concrete slabs over metal decking.

Deliveries/
Loading :
  Each building has one outdoor loading dock with hydraulic lift.

HVAC:   Seven roof mounted Trane package units for each building totaling 480 tons. One, 30-ton unit provides HVAC for each atrium & one, 75-ton unit heats and cools one half of each floor. Distribution is controlled by VAV boxes that are installed for every 2,000 sf. VAV system controllable on a floor-by-floor basis.

   

     
  ADA:   Both buildings are ADA compliant

  Electrical:   277/480 volt, 3-phase, 4-wire, 60 Hz. Voltage power per floor is 6 watts per usf and low voltage power is 2 watts per usf. Buss riser goes from floor to floor.

  Emergency
Generator:
  Protected by smoke detectors & sprinklers throughout each floor. Security cameras at the main entrance, side entrance hallways & parking garage entrances.

24 hour computer controlled security system using proximity card readers. Also monitored by a security patrol from 3:00 pm – 7:00 am M - F & 24/7 on the weekends.

  Elevators:   Two Westinghouse hydraulic elevators for each building with the capacity of
2,500 lbs.

  Fire
Safety:
  Fully sprinklered, including garages and common area restrooms; base building life safety systems tied directly into a central monitoring system.

  Utilities:

  Electricity: Jersey Central Power & Light
Water: New Jersey American Water
Sewer: Bedminster Township Sewer Utility

  Telecomm:   Lightpath Cablevision, Verizon & Comcast currently provide service to the buildings.

  Hours:   Hours of operation 8:00 am – 6:00 pm. M - F; 8:00am – 1:00pm Saturday; Federal
holidays excepted.